Customization: | Available |
---|---|
Certification: | CE, RoHS |
Material: | Stainless Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Refrigeration Wire Tube Condenser
Structure:
A. flat type of wire on tube condenser used at the back;
B bended or spiral type of wire on tube condenser used at the bottom;
C wrappen type of tube embed on the plate
Main production process:
Tube Bending,Welding,Fix the bracket,Weld the suction tube,leakage test,Coating,Folding or bending shaping,Inspection,Package
Performance:
1.Surfave with electrophoresis coating to prevent the corrosion.
2.Inner cleaness can meet the reqirement of CFC&R134a cooling system
3.Can satisfy different cooling capability requirements
Capacity: 3 million sets per year(8000sets per day)
Specification of R134a refrigerator
Residual moisture<=18mg/m2
Residual impurity<=28mg/m2
Residual mineral oil<=7mg/m2
Residual chlorine<=0.3mg/m2
Residual paraffin<=0.2mg/m2
PRODUCT NAME: | Refrigeration Wire Tube Condenser |
APPLICATION: | REFRIGERATOR,FREEZER,SHOWCASE,WATER COOLER |
REFRIGENT: | R134a |
MAIN MATERIAL: |
1,BUNDY TUBE:Ø4.76/6/6.35/8/9.52,WALL THICKNESS 0.7MM. 2,LOW CARBON STEEL WIRE Ø1.0-1.6MM. 3,BRACKET:STEEL PLATE(SPCC),THICKNESS 0.6-1.5MM. 4,STEEL PLATE:SPCC THICKNESS 0.3-0.4MM |
STRUCTURE: | 1,FLAT TYPE OF WIRE ON TUBE CONDENSER USED AT THE BACK. 2,BENDED OR SPIRAL TYPE OF WIRE ON TUBE CONDENSER USED AT THE BOTTOM. 3,WRAPPED TYPE OF TUBE EMBED ON PLATE. |
MAIN PRODUCTION PROCESS: | TUBE BENDING->WELDING->FIX THE BRACKET->WELD THE SUCTION TUBE->LEAKAGE TEST->COATING->FOLDING OR BENDING SHAPING->INSPECTION->PAKAGE. |
PERFORMANCE: |
1,SUEFACE WITH ELECTROPHORESIS COATING TO PREVENT THE CORROSION. 2,INNER CLEANESS CAN MEET THE REQUIREMENT OF CFC & R134A COOLING SYSTEM 3,CAB SATIFY DIFFERENT COOLING CAPABILITY REQUIREMENTS. |